Design, build and fit-out for commercial, office and factory since 2001. Free consultation.

Call +60 18-327 8661
Becorp Group
Call now, Mon–Sat+60 18-327 8661 Get Free Quote

Design & Build Specialist · Since 2001

Design. Build. Fit out. Commercial. Office. Factory.

Becorp designs, builds and renovates commercial buildings, offices and factories, and turns empty shells, former cinemas and tired shop-lots into functional, well-executed spaces. One team covers planning and design, construction, renovation and fit-out, handover and maintenance, with heat and sound insulation built in as added value.

  • Free consultation. We reply within one working day.
  • From a 2,270 sq ft clinic to a 65,000 sq ft event hall.
  • Written warranty on labour and materials.

Prefer to talk? Call +60 18-327 8661 Mon–Sat, office hours.

25+ years of design and build experience. Scope, timeline and results vary with each project, which is why every project is planned against its own brief.

Handover. Now move your mouse over the roof: heat and sound insulation is our added value on every project.

Spaces we have designed, built and renovated.

Real Becorp projects: converted cinemas, a church, a wellness centre and a nationwide shop-lot rollout. Tap one to tell us you want something similar.

Project details from Becorp's own records. See the full photo sets on becorpgroup.com/gallery.

Planning a space like these?

25+ yrsDesign and build experience, since 2001
65,000Square feet: our largest event hall, converted from a cinema
63Pajak Gadai and Ar-Rahnu branches in the fit-out programme
4Sectors: events, worship, retail and wellness
1 teamDesign, build, renovate and maintain

Project details as recorded by Becorp. Scope and results vary by project.

Stop juggling designers, contractors and trades.

Design, building and renovation usually mean several suppliers and several contracts. Becorp covers all six core capabilities through one accountable team, so decisions, schedules and handover stay in one place.

PlanStep 1

Before a single wall goes up.

  • Design & planningConcept, space planning and technical design built around how the space will be used.
  • Project coordinationOne accountable team coordinating designers, trades, suppliers and M&E.
BuildStep 2

On site, to the approved design.

  • ConstructionDemolition, new structure and building works with disciplined site and quality control.
  • Renovation & fit-outInterior redesign, fit-out and custom joinery that turn existing halls and shop-lots into modern spaces.
Hand overStep 3

Ready to operate, and looked after.

  • HandoverFinal inspection, documentation and a clean handover, ready for day-one operation.
  • MaintenanceOngoing upkeep after handover, plus a written warranty with a documented claims process.

One team for all six. Tell us what you are planning.

Which one sounds like your project?

Tap the one that fits. We start the conversation from there.

Most projects mix two or three of these, which is why one team covering all of them saves you time.

From brief to handover. Six steps, one team.

Each step hands you something real, so you always know where the project stands.

Step 01

Brief & site survey

We listen to what the space must do, survey the existing conditions and agree objectives and constraints.

Free consultation
Step 02

Design & planning

Concept, space planning and technical design, with architectural, interior and specialist inputs coordinated.

Layout agreed
Step 03

Scope & quotation

A clear scope, programme and price, with specialist roles confirmed for your project.

A quote you can compare
Step 04

Build or renovate

Demolition, new structure, fit-out, joinery, lighting, AV and M&E, delivered with disciplined site and quality control.

One accountable team
Step 05

Handover

Final inspection, documentation and a clean handover, ready for day-one operation.

Ready to operate
Step 06

Maintain & improve

Ongoing maintenance, a written warranty with a documented claims process, and heat and sound insulation as added value.

Support after handover

Step one is a conversation. Start it this week.

Added value · Heat & sound insulation

Then make it cooler and quieter.

On top of design, build and renovation, Becorp adds heat and sound insulation systems. Three layers, one crew, one contract, designed in from the start or retrofitted to a building you already own.

Metal roof before and after Becorp heat-control coating
Layer 1 · Coating

Solar Heat-Control Coating

Reflective coating for metal and concrete roofs and external walls taking direct sun all day.

82.8% solar reflectance · 0.87 emittance · SRI 102.92

Becorp applicator spraying cellulose insulation under a factory roof
Layer 2 · Insulation

Cellulose Fibre Insulation

Sprayed or blown into ceilings, soffits and cavities. It can reduce indoor temperature by 4–7°C and adds acoustic comfort at the same time.

R-7.4 at 50 mm · R-3.4 at 25 mm · 80% or more recycled fibre

Office window with solar-control film overlooking a city
Layer 3 · Glazing

Glazing Solar-Control Film

Cuts solar gain through windows and curtain walls, rejecting up to 89% of incoming solar energy without going dark.

Grades for daylight, glare, privacy and facade appearance

Sprayed cellulose insulation across a ceiling soffit and ductwork

Heat and echo, one ceiling.

One build-up brings the temperature and the echo down together. In industrial buildings energy use can fall by up to 30%, depending on the insulation, the building materials and the site. Retrofits go in phases so downtime stays at the practical minimum.

This is what the thermometer said.

Insulation results from Becorp's own jobs. Same roof, same infrared thermometer: 66.6°C before the heat-control coating went on, 35.1°C after.

Infrared thermometer reading 66.6 degrees Celsius on an uncoated metal roofBefore · 66.6°C
Infrared thermometer reading 35.1 degrees Celsius on the same roof after coatingAfter · 35.1°C

Metal roof surface

Uncoated, 11 March, 11.02am. Same roof after coating, 11 May, 11.48am.

Thermal camera image of a roof structure showing a 16.4 degree reduction

Thermal camera: −16.4°C

Roof underside after treatment.

Thermometer readings inside a warehouse before and after coating, 60.5 and 34.4 degrees Celsius

Warehouse: 60.5°C to 34.4°C

Underside of the roof sheet, 11 to 16 October 2019.

All readings are surface temperatures taken with an infrared thermometer or thermal camera. Results vary with the building and the site.

Want readings like these on your own building?

Enquire today. Here is what you get.

Every item below is something you can hold, file or show your board. No adjectives, only a clear plan.

  1. A free consultationTell us the space, the scope and your timeline. We reply within one working day and say honestly where to start.
  2. A site visit where it helpsWe survey the existing space and agree objectives, constraints and access.
  3. A design directionLayout, finishes and services planned around how the space will be used.
  4. A clear scope and quotationOne team, one contract, built to approved drawings.
  5. Disciplined site controlTrades, M&E and quality managed by one accountable team.
  6. A clean handoverInspection, documentation and handover, ready to operate.
  7. A written warrantyLabour and materials covered, with a documented claims process.

Built for the space you run.

Pick yours. We start the conversation from there.

Not sure which one you are? Tell us what you have in mind. We say honestly where to start.

Need EECA, GBI or ESG evidence?

Part of our insulation added value: the paperwork is built while the work happens, not chased afterwards.

  • EECA compliance supportDocumentation for facilities crossing the Act's 21,600 GJ annual threshold. In force since 1 January 2025.
  • GBI submission packEnvelope performance data prepared in the form green-building assessors expect.
  • Verified performance recordsBefore and after data for temperature, consumption and sound levels.
  • Registered energy manager reviewAudit findings checked with registered energy professionals before issue.
Becorp Experience Center at night, with the Becorp logo above a glass shopfront and a lit sign reading Experience Center

See the insulation before you sign anything.

Visit our Experience Centre in Jalan Klang Lama. Put a hand on a coated panel and an uncoated one, and watch the thermal camera settle on the difference.

No 26G & 26-1, Medan 28, Jalan Klang Lama, 58200 Kuala Lumpur

Fewer contractors. Fewer excuses.

Delays, spec swaps and missing paperwork are the reasons projects go wrong. Each one has a fix built into how we work.

One team. One clear scope. A space that works.

Questions owners ask before they enquire.

Still unsure? Tell us the space and what you want to achieve. We say honestly where to start.

How much will it cost?

It depends on the space, the scope and the finishes. After a short consultation and, where needed, a site visit, you receive a clear scope, programme and quotation for the whole project. The consultation is free, so you know where you stand before committing.

Do you handle design as well as construction?

Yes. The founder and management team's experience spans architectural and interior design, project coordination, construction, renovation and ongoing building maintenance. Specialist consultants are brought in where a project needs them.

Can you work on an existing building that is still in use?

Yes. Renovation is planned around the building, its structure and its day-to-day use, and works are sequenced to keep disruption to a minimum. Where premises must be prepared, every effort is made to keep downtime as short as practical.

What kind of spaces have you delivered?

Event halls converted from cinemas (48,000 and 65,000 sq ft), a 17,000 sq ft church, a 2,270 sq ft wellness centre and a nationwide shop-lot programme for Pajak Gadai and Ar-Rahnu across 63 branches, among others.

Is there a warranty?

Yes. Labour and materials are covered by a written warranty with a documented claims process. Final warranty scope, exclusions and duration are stated in the project contract and product documentation.

What is the heat and sound insulation add-on?

Optional added value on any project: cellulose fibre insulation, heat-control coating and solar-control film, designed in from the start or retrofitted to an existing building. Cellulose fibre insulation can reduce indoor temperature by 4–7°C, and results vary with the site.

Can you help with EECA, GBI or ESG reporting?

Yes, for insulation and energy-performance work. Reduction figures and before and after readings come formatted for sustainability reports and green-building submissions. EECA energy-consumer obligations apply at 21,600 GJ or more across 12 consecutive months, so confirm applicability with qualified advisers.

Where are you based?

Our office and Experience Centre are at No 26G & 26-1, Medan 28, Jalan Klang Lama, 58200 Kuala Lumpur. We work across Malaysia.

Planning a build, renovation or fit-out? Start with a free consultation.

Tell us the space and what you want to achieve. We reply within one working day and say honestly where to start.

No 26G & 26-1, Medan 28, Jalan Klang Lama, 58200 Kuala Lumpur. Get directions

Request your free quote

We reply within one working day.

RM

Free consultation. Scope confirmed before any commitment.

Thank you. We have your details.

Our team replies within one working day. For a faster answer, send the same details on WhatsApp now.

Send on WhatsApp Call +60 18-327 8661
WhatsApp us